All public Sources
Public document

The Aswân Obelisk With some remarks on the Ancient Engineering

DocumentAdded to Pandi 6 November 2026
Reading progressPage 11 of 16

From this book

In a subsequent model, in which the side of the funnel was vertical and made of glass, I was enabled to examine the base of the obelisk and the levels of the sand during the descent. The results shewed no reason for modifying the diagram on plate VIII except in the manner mentioned above.

It is possible that the sand was removed from above until the obelisk was low enough for there to be no fear of a jam; after that point had been passed, it would not matter from which side of the pedestal the sand was removed.

I realise that if the model were enlarged up to full-size, the grains of sand would be at least one centimetre in diameter. It seems to me that, using ordinary sand with a full sized obelisk, the flow would be better than is the case in the model, as there would be less skin-friction with the sides of the funnel. On the other hand, there may well be factors, unforeseen by me, which might render the behaviour of the full-sized obelisk different from that of the model, so I give these results without insisting that they are a proof that such a method is possible for erecting obelisks.

Another point arises in connection with the funnel; this is the possibility of the side walls of the funnel having been constructed vertically, the width of the funnel being only slightly greater than the width of the base of the obelisk. The advantage of this modification would be that if sand were piled on to the obelisk in the initial stages of its descent, the weight of the sand would be a great help in forcing the base down the funnel past the point where it might be likely to jam. It would, however, make the examination of the obelisk during its descent a difficult matter owing to lack of space.

Mr. Somers Clarke points out that, if the obelisk came down on to its pedestal supported on one edge, that the strain would crush the granite. It seems that the slot in the pedestal served a double purpose, one to keep the obelisk from twisting, and the other to ensure that the weight {41} is taken on the edge of the slot and not on the edge of the obelisk (see fig. 8). Let us assume that the edge of the slot crushes until there is 2 inches of supporting surface; then since the obelisk is about 165 inches along its base, the bearing surface will be 330 square inches and the resulting crushing stress about 3 ½ tons per square inch, which is not so very excessive. By putting moderately soft wood in the slot, the weight could be borne both by the edge of the obelisk and the edge of the slot, thus further reducing the stress set up. In the case of the standing obelisk of
Ḥ
atshepsôwet, it has come down without engaging in the slot, with the result that the corners have crushed considerably.
Fig. 8.
Position of
Ḥ
atshepsôwet’s obelisk on its pedestal.

Figure 8 shews the position of this obelisk as it now stands on its pedestal, the position taken up being C⁠D⁠E⁠F instead of C′⁠D′⁠E′⁠F′. The corners E and F have split badly owing to the great weight and have been rounded to cover up the defect. In this case the inner side of the slot, A⁠B, as far as can now be seen, is still sharp. In all the other pedestals I have examined, where the obelisks have apparently come down so as to bear on the inner edge of the slot, the edge is very distinctly crushed.

(41) Before the obelisk was pulled upright, the space in front of the obelisk, and between it and the wall B, might well be filled up with halfa and reeds, to make a kind of cushion, and to damp any tendency to rock backwards and forwards. The notch would prevent any twist before it engaged with the reed cushion. If the obelisk twisted, it was because the reed cushion was not sufficiently tightly packed, the twist taking place after it had rocked over to its further edge.

If the obelisk was on a sledge, I should think that it was removed before introducing it into the mouth of the funnel; the removal of the rollers would be automatic.

The raising of the obelisk without the aid of an embankment is proposed by Choisy in L’Art de bâtir chez les Égyptiens. He assumes that the obelisk was raised by a series of levers used horizontally on a fulcrum, and that it was heaved up simultaneously from both sides and packed from below after each heave, the obelisk and levers rising together till the obelisk was sufficiently high to lower on to the pedestal (cf. section 50 and fig. 11).

Let us assume that this method was to be used for the Aswân obelisk. I think that the largest levers practicable would be 15 metre tree-trunks used with a mechanical advantage of 10 to 1. Not more than 30 levers could be used on each side of the obelisk. The number of men required to raise the obelisk can be found to be about 56 per lever, assuming that they all heave at the end. I hardly see how such a number can be put on a horizontal lever unless we assume that a cross-baulk is attached along the ends of the levers and the whole loaded with stones. The levers would have to be dismounted at each heave and the time taken would be considerable. The method, however, is a possibility, so I include it as an alternative to the embankment. {42}

(42) Before leaving this subject, it is as well to ascertain if the obelisk is strong enough to bear the internal strain due to its own weight when it is supported at its centre of gravity.

The volume of a truncated cone is given by the formula V = H/3 (A2 + A⁠a + a2).

In the shaft of this obelisk, H is 37.25, A is 4.20 and a is 2.50 metres. Substituting, we have: V = 37.25/3 {(4.2)2 + 4.2 × 2.5 + (2.5)2} from which we find that the volume of the shaft is 426 cubic metres. Aswân granite weighs about 2.679 tons per cubic metre, which makes the shaft weigh 1143 tons.

The weight of the pyramidion is {(base)2 (height) (unit weight)}/3⁠, or (2.50)2 (4.50) (2.679)/3 = 25 tons, so that the total weight of the obelisk would have been 1143 + 25 = 1168 tons.

The distance of the centre of gravity of a tapering square-sectioned solid from the butt is given by the formula: {¼ H (A2 + 2⁠A⁠a + 3⁠a2)}/(A2 + A⁠a + a2).

Here H is 37.25 m.; A = 4.2 m.; a = 2.5 m.

Substituting we get: (37.25/4) {[(4.20)2 + 2 (2.50 × 4.20) + 3 (2.50)2]/[(4.20)2 + (2.50 × 4.20) + (2.50)2]}.

That is, the distance of the C. G. from the butt, (L⁠N on fig. 11), is 15.35 metres.

Taking the pyramidion by itself. Its height is 4.50 metres, so that its C. G. must be one-fourth that distance from the base, which makes 1.12 metres.

If x is the distance of the centre of gravity of the whole obelisk from the butt, by taking moments about the butt we have: (Total weight) × x = (weight of pyramidion) × (1.12 + length of shaft) + (weight of shaft) × 15.35, or 1168 x = 25 × 38.37 + 1143 × 15.35, from which x = 15.84. That is, the distance of the centre of gravity of the whole obelisk from the butt is 15.84 metres.

The breadth of the obelisk at its centre of gravity is 4.2 − (15.84/37.25) × (4.2 − 2.5) or 3.49 metres.

(43) Let us assume that the obelisk is balanced at its C. G., and find the stresses due to bending. The weight on each side will be equal. Taking the right hand half, its weight will act at its C. G. Using the formula for the C. G. of a tapering square-sectioned solid, quoted above, we get: (15.84/4) {[(4.20)2 + 2 (4.20) (3.49) + 3 (3.49)2]/[(4.20)2 + (4.20) (3.49) + (3.49)2]} = 7.43 metres, which means that the centre of gravity of the right-hand half of the obelisk will act at a distance of 7.43 metres from the butt, or 15.84 − 7.43 = 8.41 metres from the balancing point, or C. G. of the whole obelisk.

The sum of the moments to the right of the C. G. of the whole obelisk will be half the total weight multiplied by 8.41 = 584 × 8.41.

Then, if s is the internal stress set up due to the bending of the obelisk when supported at its C. G., we have:

(Section modulus) (stress) = sum of moments on one side of support.

The modulus of the square section is one sixth the cube of the depth, so we have: {(3.49 × 39.37)3/6} s = 584 × 8.41 × 39.37 × 2240.

From which s = 1001 pounds per square inch (39.37 being the reduction of metres to inches). {43}

The modulus of rupture for granite from Aswân is given as 1500 pounds per square inch, so it will be seen that the obelisk, if not converted into a live load (by a jerk, for instance) can be supported at its C. G. without breaking.

It is rather difficult to say how far the Egyptians were able to carry their calculations. The erection could well have been rehearsed by means of a scale-model, which could have been further used for obtaining the weight and the position of the centre of gravity. I do not think that they ever troubled about the bending-moment; at any rate, their mathematics were not sufficiently advanced for its determination. It may be that, since in all the obelisks we know of, whose taper does not vary to any great extent, can be supported anywhere, the Egyptians never had a case of such a monument breaking by its own weight.

Another interesting point arises in connection with this, and that is, since in obelisks (and all beams) of the same proportion, the bending stress due to their own weight depends on the linear dimension, and therefore the fact that a granite scale-model does not break will be no indication that the monument itself will not break when similarly supported. If the 108 cubit (56.70 metres) obelisk of
Ḥ
atshepsôwet, mentioned by
Ṭ
ḥ
utiy (section 3), does indeed apply to one and not to the two placed butt to butt on the boat shewn in the Dêr el-Ba
ḥ
ari sculpture, then, if the proportions are about the same as the Aswân obelisk, the stress set up when supported at its centre of gravity (see section 40) would be in the nature of 56.70 × 1001/41.75 = 1360 pounds per square inch, which is perilously near the breaking stress of 1500 pounds per square inch.
Continue reading
Page 11 of 16